13
Mar
Installation of a compact chain ACTIFILTRE DE SOTRALENTZ – Roquefort-les-Pins
PACA Assainissement intervened for the compliance of a villa in Roquefort les pins.
The first operation was to organize with the research firm ECO’SYSTEM Draguignan a field analysis to know what would be the best option to install.
An estimate was then drawn up according to the sizing that was selected.
The order was placed and the administrative file assembled by us, then sent to the local VEOLIA.
The realization of this rehabilitation lasted 8 days, entirely realized by our team, without subcontracting.
A compact chain SOTRALENTZ ACTIFILTRE and DRENOTUBE ecological drains have been installed.
The controller of the Spanc has validated the book allowing our client to receive the desired conformity.